Time in Money. Saving from testing the driven pile foundation of a high-rise building

Date: June 2018
Source: Piledriver
pg 64-72
Published Jun 15, 2018

Pile Dynamics CHAMP-XV (Spanish)

Date: March 2018
Source: Construccion Pan Americana (in Portuguese)
pg 20
Published Apr 27, 2018

Non-destructive Testing for Integrity Testing of Concrete Piles

Date: March 2018
Source: Piling Canada
pg 85-87
Published Mar 22, 2018

PDI launches faster cross hole analysis

Date: March 2018
Source: Ground Engineering
pg 34
Published Mar 12, 2018

Beneficios de los ensayos dinamico de pilotes

Date: October 2017
Source: SELECT PUBLICATION
pg 23-24
Published Feb 27, 2018

Pile Dynamics, Inc. Introduces The Static Load Tester

Date: November 2017
Source: PileBuck International, Inc.
Pg. 110
Published Feb 27, 2018

Pile Dynamics’ static load tester for deep foundations

Date: January 2018
Source: Southeast Asia Construction
pg 37
Published Jan 24, 2018

Pile Dynamics, Inc. introduces the Static Load Tester

Date: December 2017
Source: Piling Canada
pg 84
Published Jan 24, 2018

Benefits of Dynamic Pile Testing

Date: January 2018
Source: Piledriver
pg 82-84
Published Jan 03, 2018

Pile Dynamics, Inc. Introduces The Static Load Tester

Date: January 2018
Source: Piledriver
pg 58-59
Published Jan 03, 2018

Pile Dynamics Adds Static Load Tester

Date: January 2018
Source: Ground Engineering
pg 32  
Published Jan 03, 2018

Pile Dynamics Introduces Static Load Tester

Date: December 2017
Source: GeoDrilling International
Page 2
Published Dec 28, 2017

Associate/Engineering Affiliate Category: Downtown Juneau Floating Cruise Ship Berths

Date: September 2017
Source: Piledriver
Pages 96-105
Published Oct 12, 2017

Passion for Progress

Date: September 2017
Source: Construction Europe
Page 23
Published Oct 12, 2017

Rebar Cage Centering in Drilled Deep Foundations with Thermal Integrity Profiling

Date: April 2017
Source: Foundation Drilling
Pages: 45-53
Published Jun 12, 2017

Sarah Mildred Long Bridge: Large Diameter Drilled Shafts in Difficult Marine Environment: Integrity Testing

Date: April 2017
Source: Foundation Drilling
Page: 22-23
Published Jun 12, 2017

Pile Dynamics (PDI) presents its new Shaft Quantitative Inspection Device (SQUID) for assessing the cleanliness and competency of drilled shaft and bored pile bottoms

Date: February 2017
Source: GeoDrilling International

Published Jun 12, 2017

Pile Setup on Driven Friction Piles with GRLWEAP

Date: Jan/Feb 2017
Source: Deep Foundations
Pages: 77-80
Published Jun 12, 2017

Newsletter No. 84 – May 2017

Date: May 2017
Source: GRL and PDI Newsletter
Newsletter No. 84 – May 2017 Static and Dynamic Load Testing of Large Diameter Pipe Piles…
Published May 18, 2017

Comprehensive QA/QC Integrity Testing Using Thermal Integrity Profiler

Date: Mar/Apr 2017
Source: Deep Foundations
By Brad W. Taylor, Taylor Sales. Pages 89-91.
Published Apr 07, 2017

Piloteado de ultima generacion | Pile Dynamics, explica lost ultimos avances de la compania en ese torreno

Date: Nov/Dec 2016
Source: Construccion Pan-Americana
Páginas 50-52
Published Feb 28, 2017

ASTM D5882 Update

Date: Jan/Feb 2017
Source: Deep Foundations
Page 108.
Published Feb 28, 2017

SQUID Evaluated Bottom of Drilled Shafts

Date: February 2017
Source: PileBuck International, Inc.

Published Feb 07, 2017

Fascinating Geotechnical Engineering News 2016 video

Date: January 2017
Source: Geo News Center. Geoengineer.org
PDI’s SQUID was highlighted from 2:40-3:15.
Published Feb 06, 2017

Pile Dynamics supports revised ASTM

Date: December 2016
Source: GeoDrilling International
Page 3.
Published Dec 31, 2016

Pile Dynamics Supports Recommendations of Revised Standard for Integrity Testing

Date: Nov/Dec 2016
Source: Foundation Drilling
Pages 92, 95.
Published Dec 31, 2016

Recent PDCA Events: Recapping PDCA’s recent educational events

Date: Q4 2016
Source: Piledriver
Pages 51-52.
Published Dec 30, 2016

Determinação da capacidade de carga de estacas através de ensaios de carregamento dinâmico

Date: November 2016
Source: CONCRETO & Construções
By Jorge W. Beim, JB Instrumentação Eletrônica & Sergio Valverde, PDI Engenhaira. Pages 114-119.
Published Nov 30, 2016

Shaft Quantitative Inspection Device (SQUID) Featured in Article

Date: October 2016
Source: Concrete International
Page 107.
Published Oct 19, 2016

Shaft Quantitative Inspection Device (SQUID) Mentioned in Facing the Challenges, Foundations Article

Date: September 2016
Source: Construction Europe
Page 39.
Published Sep 30, 2016

PDI-TOMO Helps GRL Evaluate Shaft

Date: September 2016
Source: Geo News Center. Geoengineer.org

Published Sep 21, 2016

New tomography software for cross hole sonic logging: PDI-TOMO

Date: Q3 2016
Source: Piling Canada
Pages 72 and 75.
Published Sep 16, 2016

Pile Dynamics supports recommendations of revised ASTM standard for integrity testing

Date: Q3 2016
Source: Piling Industry Canada Magazine
Page 71.
Published Sep 15, 2016

PDI-TOMO included in CENews.com (Civil + Structural Engineer) Product & Software Guide

Date: June 2016
Source: Civil + Structural Engineer
Page 62.
Published Jun 30, 2016

New Tomography Software for Cross Hole Sonic Logging: PDI-TOMO

Date: June/July 2016
Source: Concrete Contractor
Page 10.
Published Jun 30, 2016

Pile Dynamics Makes CSL Analysis Easier

Date: June 2016
Source: GeoDrilling International
Page 2.
Published Jun 01, 2016

Filling In the Gaps

Date: June 2016
Source: Roads & Bridges
LITE mentioned in this article.
Published Jun 01, 2016

SQUID Penetrometer Reading Graph Corrected Values

Date: May/June 2016
Source: Foundation Drilling
Page 8.
Published Jun 01, 2016

New Tomography Software for Cross Hole Sonic Logging: PDI-Tomo

Date: May/June 2016
Source: Foundation Drilling
Page 98.
Published Jun 01, 2016

NASA Glenn Looking to Transfer Tech Research to Private Sector

Date: May '16 2016
Source: Ideastream
PDI is mentioned in this article; the sensors Mr. Fieldman refers to are the ones in Thermal Wire cables.
Published May 25, 2016

SQUID – Equipment Innovations

Date: Feb/March 2016
Source: Foundation Drilling
Pages 52-54.
Published Mar 01, 2016

Thermal Integrity Profiler Revolutionizes Quality Control of Drilled Shafts

Date: February 2016
Source: Roads & Bridges

Published Feb 10, 2016

Una nueva visión sobre el análisis de pilotes

Date: Febrero 2016
Source: Construccion Pan-Americana
Página 35.
Published Feb 01, 2016

Thermal Integrity Profile vs. Borehole Caliper Results

Date: February 2016
Source: Arab Construction World
Page 18.
Published Feb 01, 2016

Maravilla bajo tierra

Date: Enero 2016
Source: Construcción Latinoamericana
SPT Analyzer and GRLWEAP mentioned in this article.
Published Jan 28, 2016

A maravilha está abaixo

Date: Janeiro 2016
Source: Construção Latino-Americana
SPT Analyzer and GRLWEAP mentioned in this article.
Published Jan 28, 2016

Foundation Companies Had a Good 2015 and Look Forward to 2016, by Larry Kahaner

Date: January 2016
Source: Structure Magazine
Pages 29-32. Pile Dynamics was interviewed for this article, new PDI developments such as SQUID mentioned.
Published Jan 01, 2016

Temperature Sensors Cement Integrity of Bridges

Date: 2016
Source: NASA Spinoff
Pages 80-81.
Published Jan 01, 2016

Martillo de calibración SPT

Date: Enero 2016
Source: Construccion Pan-Americana
Page 41.
Published Jan 01, 2016

Celebran Congreso Geotécnico en Argentina

Date: Enero 2016
Source: Construccion Pan-Americana
Page 9.
Published Jan 01, 2016

PDCA 20th Anniversary

Date: 2015 Special Edition
Source: Piledriver
Mentions to Pile Dynamics and its founders appear throughout the publication.
Published Dec 31, 2015

Distinguished PDCA Member: Case Studies

Date: Q4 2015
Source: Piledriver
Page 103. Frank Rausche’s graduate studies in the United States helped develop the Case Method used all over the world.
Published Dec 01, 2015

Sector de geotécnica se encuentra en Buenos Aires

Date: Octubre '15 2015
Source: Construcción Latinoamericana
Article mentions a paper on Thermal Integrity Profiling to be presented at the Pan-American Conference on Soil Mechanics and Geotechnical Engineering.
Published Oct 28, 2015

New Kosciuszko Bridge – Transforming the New York City Skyline, Deep Foundations

Date: September/October 2015
Source: Deep Foundations
page 87. Article mentions first use of the Thermal Integrity Profiler in an NYSDOT project. Article link courtesy of Deep Foundations Institute.
Published Sep 01, 2015

DFI Contributes to the Success of SEFE 8

Date: September/October 2015
Source: Deep Foundations
page 37. Garland Likins’ keynote address is mentioned in the article and may be read in full here.
Published Sep 01, 2015

School with Tsunami-Safe Floor Undergoes Testing

Date: September 2015
Source: Arab Construction World
Page 10.
Published Sep 01, 2015

Nova Versão do Analisador de Cravação de Estacas é Lançado no SEFE 8

Date: Agosto 2015
Source: Fundações & Obras Geotécnicas
Páginas 94-96.
Published Aug 01, 2015

IFCEE 2015 In Review

Date: May/June 2015
Source: Foundation Drilling
Pages 25-40. Article includes interview with Dr. Anna Sellountou and PDI booth photo on page 40.
Published May 01, 2015

Frank Rausche Receives Presidential Award for Distinguished Service

Date: Q2 2015
Source: Piledriver
Page 48.
Published May 01, 2015

NASA Roadshow comes to Stark

Date: April 30, 2015
Source: The Suburbanite

Published Apr 30, 2015

Civil Engineers Develop System to Answer an Age-Old Question “What is the Integrity of This Structure?”

Date: April 16, 2015
Source: ASCE Roundup
Article about the Thermal Integrity Profiler.
Published Apr 16, 2015

2015 Pankow Award for Innovation (with Thermal Integrity Profiling video)

Date: March 2015
Source: ASCE Roundup

Published Mar 25, 2015

Introducing the PDA-8G

Date: Q1 2015
Source: Piling Canada
Pages 17-18.
Published Mar 02, 2015

Deep Foundations Innovator Talks Load Testing

Date: March 2015
Source: National Driller

Published Mar 01, 2015

Strong Foundations

Date: March/April 2015
Source: StandardizationNews, an ASTM publication
Page 49. Article on new standard on Thermal Integrity Profiling.
Published Mar 01, 2015

In Pursuit of Accuracy

Date: April 2015
Source: Foundation World
Pages 12-13. PDI involvement in small-scale load test program mentioned on this article. Article provided courtesy of ADSC.
Published Mar 01, 2015

How to Use Thermal Integrity Profiling to Assess Soil Nail Integrity

Date: February 2, 2015
Source: National Driller

Published Feb 02, 2015

Pile Dynamics launches eighth PDA

Date: February 2015
Source: Ground Engineering
Page 25.
Published Feb 01, 2015

Nuevo analizador de hincado de pilotes

Date: Febrero 2015
Source: Construccion Pan-Americana
Página 37.
Published Feb 01, 2015

A Foundation Engineering Trip Down the Mississippi

Date: Jan/Feb 2015
Source: Geo-Strata
Pages 29-33. Dynamic load testing with PDA system mentioned on page 30 of this very interesting article.
Published Feb 01, 2015

DFI Announces 2015 Osterberg Memorial Lecturer

Date: January 2015
Source: Foundation Drilling
Page 102.
Published Jan 24, 2015

Thermal Testing of Concrete Foundations Set in ASTM Standard

Date: January 2015
Source: IHS Engineering360
Pile Dynamics and Garland Likins mentioned in the article.
Published Jan 23, 2015

Dynamic Load Testing using the APPLE VIII

Date: January 2015
Source: GRL and PDI Newsletter

Published Jan 16, 2015

US Construction Spending Up, By Larry Kahaner

Date: January 2015
Source: Structure Magazine
Pages 39-44. Pile Dynamics was interviewed for this article, PDA-8G, PIR and other developments mentioned.
Published Jan 01, 2015

Deep Analysis: Tablet-thin device aids dynamic load testing

Date: December 2014
Source: Roads & Bridges
Page 44.
Published Dec 31, 2014

Analyzing Atlantic Canada, Driveability assessments and PDA testing remain GEMTEC’s core strengths

Date: Q4 2014
Source: Piling Canada
Pages 66-69. The Pile Driving Analyzer® system is mentioned extensively in this article.
Published Dec 30, 2014

Protocollo FCA: Metodologia NDT per la stima dello spessore di lastre in c.a. ispezionabili da un solo lato

Date: December 2014
Source: In Concreto

Published Dec 01, 2014

Pile profiling

Date: December 2014
Source: GeoDrilling International
Page 21.
Published Dec 01, 2014

New model for Pile Integrity Tester

Date: November/December 2014
Source: Southeast Asia Construction
Page 34.
Published Nov 30, 2014

Osterberg Lecture 2015

Date: Nov/Dec 2014
Source: Deep Foundations
Page 43.
Published Nov 30, 2014

New System for Dynamic Load Testing of Piles

Date: November 2014
Source: Engineering News Record (ENR)
Page 8.
Published Nov 17, 2014

International Geo-Industry Conference in Brazil Focused on Themes of Interest to ADSC Members

Date: Nov/Dec 2014
Source: Foundation Drilling
Pages 51-52.
Published Nov 01, 2014

Pile Driving Analyzer® Model 8G

Date: October 2014
Source: Foundation Drilling
Page 102.
Published Oct 01, 2014

Chapter News: PDCA of Texas Chapter

Date: Q3 2014
Source: Piledriver
Page 41.
Published Sep 15, 2014

Garland Likins Passes the Torch

Date: Q3 2014
Source: Piledriver
Page 36.
Published Sep 15, 2014

Evaluating CFA/ACIP Piles

Date: September 2014
Source: GRL and PDI Newsletter
Page 1.
Published Sep 04, 2014

Optimizing Driven Pile Foundations Design-build and remote PDA testing

Date: Q3 2014
Source: Piling Canada
Page 71-74. The SiteLink® functionality of the Pile Driving Analyzer® system is featured in this article.
Published Sep 01, 2014

Increasing Reliability of SPT Testing in Saudi Arabia

Date: August 2014
Source: Arab Construction World
Page 15.
Published Aug 25, 2014

Garantindo a Qualidade dos Ensaios de Qualidade – um desafio

Date: Agosto 2014
Source: Fundações & Obras Geotécnicas
Paginas 64-66.
Published Aug 05, 2014

Vice President Biden Speaks on Infrastructure: A First Person Account

Date: July 2014
Source: Foundation Drilling
Pages 56-60.
Published Jul 31, 2014

Garantindo a qualidade das estacas moldadas in loco. O que há na sua caixa de ferramentas?

Date: Julho 2014
Source: Construccion Pan Americana (in Portuguese)

Published Jul 02, 2014

Garantizando la calidad de los pilotes barrenados, ¿Qué hay en su caja de herramientas?

Date: Julio 2014
Source: Construccion Pan-Americana

Published Jul 02, 2014

Hot Stuff; Jakarta Monorail Piles Checked with TIP

Date: June 2014
Source: International Construction
Page 53.
Published Jun 30, 2014

The Economic Advantages of Dynamically Monitoring Driven Pile

Date: Q2 2014
Source: Piledriver
Pages 102-107.
Published Jun 30, 2014

Ensaio de Integridade PIT vira tema de workshop

Date: June 2014
Source: Fundações & Obras Geotécnicas
Paginas 38-41.
Published Jun 01, 2014

Ohio Tries Time-Saving Thermal Integrity Profiling

Date: May/June 2014
Source: Innovator
Pages 12-13.
Published May 31, 2014

The ß-Method, Reliable and Proven for Pile QA/QC

Date: May 2014
Source: GRL and PDI Newsletter
Page 1.
Published May 05, 2014

Thermal Integrity Profiler Wins 2013 C. William Bermingham Award for Innovation

Date: April 2014
Source: Concrete International
Page 62.
Published Apr 05, 2014

NASA GRC, Cleveland, Cuyahoga County “Adopt a City” Project Receives State & Local Economic Development Award

Date: March 5, 2014
Source: www.spaceref.com, Nasa Glenn Research Center

Published Mar 05, 2014

Continuing the Tradition

Date: Q1 2014
Source: Piledriver
Pages 155-156.
Published Mar 01, 2014

George Piscsalko: A Quiet Curiosity

Date: Jan/Feb 2014
Source: Deep Foundations
Pages 47-48.
Published Jan 31, 2014

Pile Driving Between the Amazon and Xingu Rivers: Solution Found

Date: Jan/Feb 2014
Source: Deep Foundations
Pages 53-56.
Published Jan 31, 2014

Inventors from Pile Dynamics and the University of South Florida Receive International NOVA Award for Thermal Integrity Profiler (TIP)

Date: January/February 2014
Source: Geo-Strata
Pages 51-52. Excerpts of article are posted.
Published Jan 30, 2014

Michael W. O’Neil Remembered. ADSC’s Dr. Michael W. O’Neil Lecture Award Announced

Date: January 2014
Source: Foundation Drilling
Pages 38-41.
Published Jan 25, 2014

Foundation Sector Grounded in Optimism for New Year

Date: January 2014
Source: Structure Magazine
Page 46.
Published Jan 22, 2014

Analizador Térmico de Integridad de Pilotes

Date: Enero 2014
Source: Construccion Pan-Americana
Página 45.
Published Jan 15, 2014

International NOVA Award for TIP

Date: December 2013 - January 2014
Source: Arab Construction World
Page 54.
Published Jan 01, 2014

Laying a Career Foundation

Date: Q4 2013
Source: Piledriver
Pages 147-148.
Published Dec 31, 2013

Inventors from Pile Dynamics and the University of South Florida Receive International NOVA Award for Thermal Integrity Profiler (TIP)

Date: Q4 2013
Source: Piling Canada
Page 14.
Published Dec 30, 2013

The TIP is Tops

Date: Q4 2013
Source: Piling Canada
Pages 19-24.
Published Dec 29, 2013

Pile Dynamics Recognized with International NOVA Award

Date: December 2013
Source: Properties Magazine
Page 39.
Published Dec 28, 2013

2013 NOVA Award winner

Date: December 2013
Source: Construction Innovation Forum

Published Dec 01, 2013

The Evolution of Augered Cast-in-Place Piles

Date: November/December 2013
Source: Deep Foundations
Pages 12-15. Written by Willie M. NeSmith, P.E., Alan Roach and W. Morgan NeSmith, P.E. Excerpts of article are posted. Full Article at www.dfi.org.
Published Dec 01, 2013

Dynamic Monitoring of Piles Using Remote Testing Capabilities

Date: November 2013
Source: Arab Construction World
Page 16.
Published Nov 29, 2013

New Tete Bridge over the Zambezi in Mozambique

Date: November 2013
Source: Civil Engineering
Pages 53-56.
Published Nov 15, 2013

ADSC Technical Affiliate Members Winner of DFI’s 2013 C. William Bermingham Award for Innovation

Date: September/October 2013
Source: Foundation Drilling
Page 64.
Published Oct 01, 2013

TIP Wins 2013 C. William Bermingham Award

Date: October 2013
Source: Arab Construction World
Page 52.
Published Oct 01, 2013

The C. William Bermingham Award for Innovation

Date: Sept/Oct 2013
Source: Deep Foundations
Page 20.
Published Sep 30, 2013

Firm Foundations

Date: September 2013
Source: Construction Europe
Pages 40 – 46. Excerpts of article are posted.
Published Sep 30, 2013

People & Companies

Date: July/Aug 2013
Source: Deep Foundations
Page 86. Garland Likins’ leadership award and Frank Rausche’s D.GE naming mentioned in this excerpt.
Published Aug 01, 2013

Innerbelt Bridge Project Video eAlert

Date: July 23 2013
Source: Roads & Bridges

Published Jul 23, 2013

Ensaio de Integridade de Estacas por Perfilagem Térmica – TIP

Date: July 2013
Source: Fundações & Obras Geotécnicas
Pages 58-63.
Published Jul 15, 2013

G-I Organizational Member News

Date: May/June 2013
Source: Geo-Strata
Pages 64-67. Garland Likins’ leadership award and Frank Rausche’s D.GE naming mentioned in this excerpt.
Published Jun 01, 2013

PDI’s Rausche, Likins Honored by Engineering Community

Date: May/June 2013
Source: Ohio Contractor
Page 30.
Published Jun 01, 2013

Wireless Hammer for the Pile Integrity Tester

Date: May/June 2013
Source: Arab Construction World
Page 10.
Published Jun 01, 2013

Pile Dynamics Building is now officially Green

Date: June 2013
Source: Piling Industry Canada Magazine
Page 8.
Published Jun 01, 2013

Pile Dynamics – LEED Certification for Building

Date: Q2 2013
Source: Piledriver
Page 33.
Published Jun 01, 2013

A top TIP

Date: May 2013
Source: GeoDrilling International
Page 30.
Published May 20, 2013

From the Pile; Pile Dynamics Inc. Celebrates its Leaders’ Achievements

Date: Q2 2013
Source: Piling Canada
Page 7. Excerpts of article are posted.
Published May 15, 2013

Underwater Dynamic Pile Testing

Date: May 2013
Source: GRL and PDI Newsletter
Pages 1-2.
Published May 01, 2013

Métodos para Avaliação da Qualidade de Estacas – Conceitos Básicos e Desenvolvimentos Recentes

Date: Abril 2013
Source: Fundações & Obras Geotécnicas
Paginas 64-68.
Published Apr 20, 2013

Application of Pile Dynamics to Quality Assurance in Deep Foundations Seminar

Date: April 16, 2013
Source: Joint Transportation Research Program (JTRP)

Published Apr 16, 2013

LEED Certification for Solon Building

Date: March 14, 2013
Source: Chagrin Solon Sun
Page A4.
Published Mar 14, 2013

Pile Dynamics/GRL Engineers Headquarters Earns LEED Certification

Date: February 2013
Source: Properties Magazine
Page 37.
Published Feb 25, 2013

Properties People; Highlighting notable industry events

Date: February 2013
Source: Properties Magazine
Page 9.
Published Feb 25, 2013

Fondazioni: Prova di Integrità – Metodo di prova a bassa deformazione

Date: February 2013
Source: Master Magazine
Pages 10-23.
Published Feb 15, 2013

Pile Buck’s Interview with Bengt Fellenius, P.E.; Renowned Foundation Engineer, Philosopher, Mentor

Date: Vol. 29, Issue 1 2013
Source: PileBuck International, Inc.
Pages 13 – 23.
Published Feb 05, 2013

Novos Métodos estão sendo aplicados na região

Date: Janeiro-Fevereiro 2013
Source: Construção Latino-Americana
Pages 31-34. Excerpts of article are posted.
Published Feb 01, 2013

Nuevos Métodos y tecnologías están siendo aplicados en la region

Date: Enero-Febrero 2013
Source: Construcción Latinoamericana
Pages 31-34. Excerpts of article are posted.
Published Feb 01, 2013

Foundations; Slow and Steady Upswing for Foundation Business

Date: January 2013
Source: Structure Magazine
Pages 31-34. Excerpts of article are posted.
Published Jan 25, 2013

Jet Grouting: An Application of Thermal Integrity Profiling

Date: January 2013
Source: GRL and PDI Newsletter
Page 1.
Published Jan 18, 2013

CТРУЙНAЯ ЦEМEНТAЦИЯ: ОЦEНКA ТЕПЛОВОГО ПРОФИЛЯ

Date: январъ, 2013
Source: GRL and PDI Newsletter
Page 1.
Published Jan 17, 2013

Digging Deep in 2013

Date: January 2013
Source: Engineering News Record (ENR)
Pages U1 – U11. Excerpts of article are posted.
Published Jan 15, 2013

PDI: 40 years of Engineering & Innovation

Date: December 2012
Source: Arab Construction World
Page 42.
Published Dec 26, 2012

Brückenpfeiler mit Hammer geprüft

Date: December 7, 2012
Source: Furth Im Wald
Page 7.
Published Dec 07, 2012

Pile Dynamics Celebrates 40 Years in Business

Date: November/December 2012
Source: Ohio Contractor
Page 32.
Published Dec 06, 2012

Pile Dynamics Wins Manufacturing Innovation Project Award, Collaboration with NASA

Date: December 2012
Source: Concrete International
Page 61.
Published Dec 01, 2012

Pile Dynamics Celebrates 40 Years of Engineering and Innovation

Date: November/December 2012
Source: Geo-Strata
Pages 45-46.
Published Dec 01, 2012

Landmark Projects: Dynamic Foundation Testing

Date: Nov/Dec 2012
Source: Deep Foundations
Pages 53-55.
Published Nov 05, 2012

Thermal Integrity Profiler Wins Manufacturing Innovation Project Award

Date: Issue 3 2012
Source: Piling Canada
Page 8.
Published Nov 01, 2012

PDI: A Keynote Lecturer in Japan

Date: November 2012
Source: Arab Construction World
Page 34.
Published Nov 01, 2012

Product Showcase Testing Equipment; Thermal Integrity Profiler

Date: October 2012
Source: Concrete International
Pages 62-63. Excerpts of article are posted.
Published Oct 01, 2012

Seminars on “Lanjing” (note: Lanjing is the derrick barge with lift capacity of 7,500 tons belonging to COOEC)

Date: September 18, 2012
Source: China Ocean Oil Newspaper
Article is in Chinese.
Published Sep 18, 2012

Pile Dynamics, Inc. A 40-year Reflection

Date: Q3 2012
Source: Piledriver
Pages 63-65.
Published Sep 10, 2012

Dynamic Testing of Helical Piles

Date: September 2012
Source: Arab Construction World
Page 8.
Published Sep 05, 2012

Pile Dynamics Wins Manufacturing Innovation Project Award

Date: August 2012
Source: Foundation Drilling
Page 54.
Published Aug 25, 2012

Making Testing More Comfortable

Date: Jul-Aug 2012
Source: Southeast Asia Construction
Page 42.
Published Jul 31, 2012

TIP Wins Manufacturing Innovation Project Award

Date: July/August 2012
Source: Geo-Strata
Page 64.
Published Jul 30, 2012

TIP Wins Manufacturing Innovation Project Award

Date: July 2012
Source: Arab Construction World
Page 47.
Published Jul 07, 2012

Concrete Pile Profiler

Date: July 2012
Source: CE News
Page 55.
Published Jul 05, 2012

Pile Dynamics, Inc.’s New Cross Hole Sonic Logging Accessory

Date: June/July 2012
Source: Foundation Drilling
Page 98.
Published Jun 30, 2012

New Accessories for Cross Hole Sonic Logging Makes Testing more Confortable

Date: June 2012
Source: Piling Industry Canada Magazine
Page 10.
Published Jun 22, 2012

New Accessories for Augered Cast-In-Place / CFA Pile Installation Monitoring

Date: June 2012
Source: Piling Industry Canada Magazine
Pages 6-8.
Published Jun 22, 2012

Pile Dynamics: New Accessory for Cross Hole Sonic Logging

Date: Issue 2 2012
Source: Piling Canada
Page 4.
Published Jun 15, 2012

Pile Dynamics – A 40-Year Reflection

Date: Issue 2 2012
Source: Piling Canada
Pages 35-38.
Published Jun 14, 2012

Partnering on Skills

Date: June 7, 2012
Source: US Dept of Labor
The Manufacturing Innovation Project Award mentioned in this article was given to PDI for the Thermal Integrity Profiler. Please scroll to the [...]
Published Jun 07, 2012

Covering all Bases

Date: June 2012
Source: International Construction
Pages 47-49. Excerpts of article are posted.
Published Jun 03, 2012

CSL’s Accessory Makes Testing More Comfortable

Date: June 2012
Source: Arab Construction World
Page 24.
Published Jun 02, 2012

New Accessory for Cross Hole Sonic Logging Makes Testing More Comfortable

Date: June 2012
Source: Structural Concrete
Page A9.
Published Jun 01, 2012

Dynamic Pile Testing at the Samuel Simmonds Memorial Hospital, Barrow, Alaska

Date: Vol. 28 No. 1 2012
Source: PileBuck International, Inc.
Pages 12-16.
Published Jun 01, 2012

New Accessories and Software for Pile Dynamics’ PIR

Date: May-Jun 2012
Source: Southeast Asia Construction
Page 52.
Published May 31, 2012

New PDI Accessories for ACIPs

Date: May/June 2012
Source: Deep Foundations
Page 87.
Published May 31, 2012

Thermal Integrity Profiling: An Innovative Technique for Drilled Shafts

Date: May/June 2012
Source: Deep Foundations
Pages 51-54.
Published May 30, 2012

Site Equipment – What’s New; New Accessories for Augered Cast-in-Place / CFA Pile Installation Monitoring

Date: Vol. 3, Number 4, 2012
Source: Contractors World
Page 24.
Published May 28, 2012

Pile Driving Formulas

Date: Q2 2012
Source: Piledriver
Pages 60-67.
Published May 25, 2012

2012 NASA/MAGNET Manufacturing Innovation Project Winners

Date: May 23, 2012
Source: MAGNET

Published May 23, 2012

Monitoring Device for CFA Piles

Date: May 2012
Source: National Driller
Page 54.
Published May 16, 2012

Dynamic Testing; Pile Dynamics’ Analysis of Stress Wave Propagation Conforms to Standards

Date: May 2012
Source: GeoDrilling International
Page 31.
Published May 15, 2012

New Accessory for Cross Hole Sonic Logging Makes Testing More Comfortable

Date: May 2012
Source: PileBuck International, Inc.

Published May 04, 2012

Dynamic Testing of Helical Piles

Date: May 2012
Source: GRL and PDI Newsletter
Page 1.
Published May 02, 2012

A Strong Foundation: Solon-based Pile Dynamics, Inc. is an Industry Leader

Date: May 2012
Source: Solon Magazine
Page 7.
Published May 01, 2012

New Accessories for ACIP and CFA Pile Installation Monitoring

Date: April 2012
Source: Civil Engineering
Page 72.
Published Apr 29, 2012

Novo acessório para o monitoramento de fundações

Date: Abril 2012
Source: Construção Latino-Americana
Página 20.
Published Apr 20, 2012

Nuevo Accesorio Para el Monitoreo de Fundaciones

Date: Abril 2012
Source: Construcción Latinoamericana
Página 20.
Published Apr 20, 2012

New Accessories for CFA Pile Installation Monitoring

Date: April 2012
Source: Arab Construction World
Page 32.
Published Apr 05, 2012

Potenza e controllo

Date: Marzo-Aprile 2012
Source: Perforazioni & Fondazioni
Pages 74-75.
Published Apr 02, 2012

Cleveland’s Innerbelt Bridge Project

Date: Q1 2012
Source: Piledriver
Pages 57-59.
Published Mar 31, 2012

Dynamic Load Testing Conforms to new ASTM D-7383 Rapid Load Testing Standard

Date: February 2012
Source: GRL and PDI Newsletter
Page 1.
Published Feb 10, 2012

World’s Largest H-Piles Debut

Date: Jan/Feb 2012
Source: Deep Foundations
Page 81.
Published Jan 31, 2012

Foundation Companies Taking Advantage of Current Events and Trends; Bids Now More Realistic

Date: January 2012
Source: Structure Magazine
Pages 31-32. Excerpts of article are posted.
Published Jan 15, 2012

Neue GuD-Technik

Date: December 2011
Source: GuDaktuell
Page 1.
Published Dec 30, 2011

Pile Dynamics, Inc. Develops Breakthrough Test for Concrete Foundations in Partnership with FGE

Date: December 2011
Source: Piling Industry Canada Magazine
Pages 8-10.
Published Dec 26, 2011

The Integrity Testing Tool Box; A Brief Summary of the Most Commonly Employed Tests and Instruments

Date: December 2011
Source: Piling Industry Canada Magazine
Pages 14-16.
Published Dec 25, 2011

Forward Thinking

Date: Fall/Winter 2011
Source: Think; The Magazine of Case Western Reserve University
Pages 29-36. Excerpts of article are posted.
Published Dec 01, 2011

Innovative Technique Tests Pile Integrity

Date: November 2011
Source: Foundation World

Published Nov 14, 2011

Pile Dynamics, Inc. Develops Breakthrough Test for Concrete Foundations in Partnership with FGE

Date: Issue 2 2011
Source: Piling Canada
Page 9.
Published Nov 01, 2011

Structural Integrity of Drilled Shaft Foundations by Thermal Measurements

Date: November 2011
Source: Structural Engineer (Formally Structural Engineering And Design)
Pages 46-48.
Published Nov 01, 2011

Cimientos Digitales; Un detector de calor que puede ver la calidad de los cimientos

Date: October 2011
Source: Construccion Pan-Americana
Page 54.
Published Oct 10, 2011

Pile Dynamics Develops Test for Thermal Integrity Profiler (TIP)

Date: September/October 2011
Source: Foundation Drilling
Page 103.
Published Oct 03, 2011

Thermal Integrity Profiler for Concrete Foundations

Date: Sept-Oct 2011
Source: Southeast Asia Construction
Page 40.
Published Oct 02, 2011

Pile Dynamics, Inc. Develops Breakthrough Test for Concrete Foundations

Date: September/October 2011
Source: Geo-Strata
Page 64.
Published Oct 01, 2011

Pile Dynamics Pile Detection for Montenegro Resort

Date: Fall 2011
Source: Deep Foundations
Pages 50-51.
Published Oct 01, 2011

Digging Deep

Date: September 2011
Source: Construction Europe
Pages 29-35. Excerpts of article are posted.
Published Sep 30, 2011

Pile Dynamics, Inc (PDI) Announces the PIR Viewer

Date: September 2011
Source: Geotechnical News
Page 46.
Published Sep 15, 2011

Progress

Date: September 2011
Source: GRL and PDI Newsletter
Page 1.
Published Sep 09, 2011

Academia and practice can work together

Date: August 2011
Source: The Zweig Letter
Page 5.
Published Aug 22, 2011

New Method to Assess the Quality of Cast-in-Place Concrete Foundations

Date: August 2011
Source: Arab Construction World
Page 19.
Published Aug 05, 2011

GRLWEAP 2010, GRLWEAP Offshore Wave Released

Date: Summer 2011
Source: Deep Foundations
Page 85.
Published Jul 01, 2011

Gaining Ground

Date: June 2011
Source: International Construction
Page 41-46. Excerpts from article are posted.
Published Jun 30, 2011

Your CSL Results Are In – What To Do Next?

Date: June 2011
Source: Piling Industry Canada Magazine
Pages 36-37.
Published Jun 30, 2011

Where Are They Now?: Brent Robinson ’99

Date: Summer 2011
Source: Case Alumnus
Page 28.
Published Jun 30, 2011

Pile Software

Date: June 2011
Source: Structural Engineer (Formally Structural Engineering And Design)
Page 50.
Published Jun 15, 2011

New Pile Integrity Tester

Date: May - June 2011
Source: Southeast Asia Construction
Page 32.
Published May 31, 2011

Pile-Monitoring Device Features Improvements

Date: May 2011
Source: Concrete International
Page 57.
Published May 10, 2011

Thermal Integrity Profiler

Date: May 2011
Source: GRL and PDI Newsletter
Page 1.
Published May 06, 2011

Pile Dynamics, Inc. Releases Pile Integrity Tester Model PIT-X2

Date: April-May 2011
Source: Georgia Engineer
Pages 26-27.
Published May 01, 2011

Specifiers Guide: Inspection Instruments, Inc

Date: April 2011
Source: Structural Engineer (Formally Structural Engineering And Design)
Page 44.
Published Apr 30, 2011

Mid-Atlantic Construction

Date: April 2011
Source: Engineering News Record (ENR)
Page 57. Excerpts of article are posted.
Published Apr 25, 2011

Wireless Testing

Date: April 2011
Source: Roads & Bridges
Page 65. Excerpts of article are posted.
Published Apr 15, 2011

Pile Dynamics Releases New Pile Integrity Tester Model PIT-X2

Date: March - April 2011
Source: Foundation Drilling
Page 99.
Published Apr 01, 2011

Concrete Integrity: Accurate Testing

Date: March 2011
Source: Engineering News Record (ENR)
Page 37.
Published Mar 07, 2011

DFI People And Companies

Date: Winter 2011
Source: Deep Foundations
Page 45.
Published Feb 21, 2011

Pile Dynamics Redesigns Products

Date: Winter 2011
Source: Deep Foundations
Page 41.
Published Feb 21, 2011

Products & Practice Showcase: Inspection Instructions, Inc

Date: February 2011
Source: Concrete International
Page 75.
Published Feb 15, 2011

Geotechnology goes high-tech

Date: February 2011
Source: CE News
Page 42-43.
Published Feb 15, 2011

Foundation Firms Seeing Improvement: Business is Getting Better

Date: January 2011
Source: Structure Magazine
Page 35 – 40. Excerpts of article are posted.
Published Jan 31, 2011

Pile Dynamics Redesigns Automated Monitoring Equipment for ACIP / CFA Piles

Date: Issue 2 2010
Source: Piling Canada
Page 8.
Published Dec 31, 2010

GRL Engineers offers Dynamic Foundation Testing Services

Date: Issue 2 2010
Source: Piling Canada
Page 22.
Published Dec 31, 2010

Pile Dynamics, Inc (PDI) Redesigns Pile Installation Recorder (PIR) Automated Monitoring Equipment

Date: December 2010
Source: Geotechnical News
Page 66.
Published Dec 21, 2010

Lake Austin Lakeside Estate

Date: Q4 2010
Source: Piledriver
Page 47-49.
Published Dec 15, 2010

Pile Monitoring Equipment

Date: December 2010
Source: Structural Engineer (Formally Structural Engineering And Design)
Pages 38-39.
Published Dec 15, 2010

Building ‘dynamic’ fertilizer plant in Vietnam

Date: November - December 2010
Source: Southeast Asia Construction
Page 61.
Published Dec 01, 2010

GRL Engineers Offers SiteLink Dynamic Foundation Testing Service

Date: October-November 2010
Source: Georgia Engineer
Page 23.
Published Nov 01, 2010

PDI’s SitelinkTM Brochure Wins National Award

Date: Fall 2010
Source: Piling Industry Canada Magazine
Page 10.
Published Nov 01, 2010

GRL Engineers Offers Sitelink Dynamic Foundation Testing Services

Date: Fall 2010
Source: Piling Industry Canada Magazine
Page 46.
Published Nov 01, 2010

Pile Dynamics Redesigns Automated Monitoring Equipment for ACIP / CFA Piles

Date: Fall 2010
Source: Piling Industry Canada Magazine
Page 41.
Published Nov 01, 2010

Pile Dynamics Redesigns Automated Monitoring Equipment for ACIP / CFA Piles

Date: October 2010
Source: Arab Construction World
Page 48.
Published Oct 01, 2010

Monitor de pilotes de última tecnoloģia

Date: Octubre 2010
Source: Construccion Pan-Americana
Page 44.
Published Oct 01, 2010

Pile Recording; A New Model of the Pile Installation Recorder (PIR)

Date: October 2010
Source: Construction Europe
Page 50.
Published Oct 01, 2010

Application On Site; Investigating Old Foundation in South Korea

Date: September/October 2010
Source: Southeast Asia Construction
Page 52.
Published Sep 28, 2010

New Products: PIT Testing Now Easier with Lightweight and Compact Device

Date: September 2010
Source: Builders Exchange Magazine
Page 40.
Published Sep 15, 2010

Foundations: Enviromental Awareness

Date: September 2010
Source: Construction Europe
Pages 39-44.
Published Sep 12, 2010

Hussein Receives GMEC Award

Date: September 2010
Source: Geotechnical News
Page 8.
Published Sep 08, 2010

New Products: Signal Matching During the Pile Test

Date: September 2010
Source: Better Roads
Page 37.
Published Sep 08, 2010

Forever Wave Equation

Date: September 2010
Source: GRL and PDI Newsletter
Page 1.
Published Sep 06, 2010

We’ve Moved

Date: September 2010
Source: GRL and PDI Newsletter
Page 1.
Published Sep 05, 2010

Discovery Channel – APE D180 Diesel Hammer on Highway 880 Oakland California

Date: August 26, 2010
Source: YouTube
A Pile Driving Analyzer® system appears in this video about the installation of piles for Highway 880 in Oakland, California.
Published Aug 26, 2010

Hussein Receives GMEC Award

Date: July/August 2010
Source: Geo-Strata
Page 58.
Published Jul 31, 2010

Pile Capacity by Signal Matching

Date: July 2010
Source: Civil Engineering
Page 76.
Published Jul 29, 2010

Remote Pile Testing Service from GRL Engineers

Date: July 2010
Source: Contractors World

Published Jul 10, 2010

Pile Talk: Remote Dynamic Foundation Testing

Date: Issue 1 2010
Source: Piling Canada
Pages 3-4.
Published Jul 05, 2010

Pile Talk: Smaller, wireless Pile Integrity Tester unveiled

Date: Issue 1 2010
Source: Piling Canada
Page 4.
Published Jul 05, 2010

Technology Update: iCAPTM, pile capacity by signal matching

Date: Issue 1 2010
Source: Piling Canada
Page 34.
Published Jul 05, 2010

Pile Dynamics Analyzer Update

Date: Summer 2010
Source: Deep Foundations
Page 72.
Published Jul 02, 2010

DFI People and Companies

Date: Summer 2010
Source: Deep Foundations
Pages 44-46. Excerpts of article are posted.
Published Jul 02, 2010

Foundation Systems

Date: July 2010
Source: Structural Engineer (Formally Structural Engineering And Design)
Pages 36-38. Excerpts of article are posted.
Published Jul 01, 2010

Pile Dynamics’ PDA enhanced with iCap software

Date: July - August 2010
Source: Southeast Asia Construction
Page 40.
Published Jul 01, 2010

Introducing iCAP™: Pile Capacity During Driving

Date: July 2010
Source: Arab Construction World
Page 22.
Published Jul 01, 2010

ADSC Technical Affiliate Member, Mohamad Hussein, Receives Florida Engineering Award

Date: June/July 2010
Source: Foundation Drilling
Pages 92-95.
Published Jun 15, 2010

Prüfung der Homogenität einer Versuchsdichtwand mit der Cross-Hole-Methode

Date: Juni 2010
Source: Bautechnik
Seite 354 – 358.
Published Jun 06, 2010

2010 GMEC Award Recipient Mohamad Hussein, PE

Date: June 2010
Source: Florida Engineering Society Journal
Page 7.
Published Jun 01, 2010

El puente más largo de Ecuador

Date: Junio 2010
Source: Construccion Pan-Americana
Pages 30-31.
Published Jun 01, 2010

CEU, PDH ProviderStatus Renewed

Date: June 2010
Source: Concrete International
Page 65.
Published Jun 01, 2010

ICAP™, Pile Capacity by Signal Matching

Date: June 2010
Source: Arab Construction World
Page 8.
Published Jun 01, 2010

Tecnologias à favor da construção civil

Date: Maio 2010
Source: Portal Obra24horas
Excerpts of article are posted.
Published May 30, 2010

News From GRL

Date: Spring 2010
Source: Drill Bits
Page 28.
Published May 16, 2010

iCap™ – a New Wave for Dynamic Testing

Date: May 2010
Source: GRL and PDI Newsletter
Page 1.
Published May 15, 2010

Pile Dynamics Unveils Smaller, Wireless Pile Integrity Tester – PIT-X

Date: April-May 2010
Source: Georgia Engineer
Page 19.
Published May 05, 2010

Wireless Pile Integrity Tester Unveiled

Date: Spring 2010
Source: Deep Foundations
Page 86.
Published Apr 05, 2010

New Product News: Smaller Wireless Pile Integrity Tester Unveiled

Date: March/April 2010
Source: Foundation Drilling
Page 90.
Published Mar 30, 2010

Smaller, Wireless Pile Integrity Tester

Date: March/April 2010
Source: Southeast Asia Construction
Page 48. Excerpts of article are posted.
Published Mar 29, 2010

Pile Driving Demonstrations – Then and Now

Date: Q1 2010
Source: Piledriver
Pages 48-51.
Published Mar 15, 2010

The Foundations for the A. Max Brewer Bridge Replacement and Enhancement Project

Date: March 2010
Source: Arab Construction World
Page 23.
Published Mar 02, 2010

Cimientos de Última Tecnología

Date: Marzo 2010
Source: Construccion Pan-Americana
Página 50.
Published Mar 01, 2010

Foundation Testing Unit

Date: March 2010
Source: Engineering News Record (ENR)
Page 51.
Published Mar 01, 2010

GRL Engineers, Inc. Opens Louisiana Office

Date: Vol. 26, Issue 1 2010
Source: PileBuck International, Inc.
Page 9.
Published Feb 28, 2010

Pile Dynamics adds LITE to Deep Foundations Product Line

Date: Vol. 26, Issue 1 2010
Source: PileBuck International, Inc.
Page 9.
Published Feb 28, 2010

Core Bits: G-I Organizational Member News: GRL and PDI Retain Authorized Provider Status

Date: January/February 2010
Source: Geo-Strata
Page 58. Excerpts of article are posted.
Published Feb 03, 2010

Concrete Products

Date: February 2010
Source: Structural Engineer (Formally Structural Engineering And Design)
Pages 36-37. Excerpts of article are posted.
Published Feb 02, 2010

La Novedad Para Cimentaciones Profundas

Date: Enero 2010
Source: Construccion Pan-Americana
Página 27.
Published Jan 20, 2010

Pile Dynamics LITE

Date: Winter 2010
Source: Deep Foundations
Page 82.
Published Jan 18, 2010

Remote Dynamic Foundation Testing

Date: January 2010
Source: GRL and PDI Newsletter
Page 1.
Published Jan 03, 2010

Foundation Companies: Working Their Way Through the Downturn

Date: January 2010
Source: Structure Magazine
Page 34. Excerpts of article are posted.
Published Jan 01, 2010

Did You Know?

Date: Q4 2009
Source: Piledriver
Page 22.
Published Dec 29, 2009

Pile Talk:Pile Dynamics adds LITE to deep foundations product line

Date: Issue 2 2009
Source: Piling Canada
Page 3.
Published Dec 21, 2009

Pile Talk:GRL and PDI retain status as Authorized Providers of IACET CEUs; GRL retains status as Florida Authorized Provider of PDHs

Date: Issue 2 2009
Source: Piling Canada
Pages 3-4.
Published Dec 21, 2009

Piling Industry News: Pile Dynamics adds LITE to Deep Foundations Product Line

Date: Fall/Winter 2009
Source: Piling Industry Canada Magazine
Page 8. Excerpts of article are posted.
Published Dec 20, 2009

Foundation Systems and Products

Date: December 2009
Source: Structural Engineer (Formally Structural Engineering And Design)
Pages 36-39. Excerpts of article are posted.
Published Dec 18, 2009

Driven Pile Cost Comparison for Two Large Wisconsin DOT Bridge Projects

Date: Q4 2009
Source: Piledriver
Pages 38-42.
Published Dec 01, 2009

Large Structures: Mastering Water

Date: November 2009
Source: International Construction
Pages 45 – 51. Excerpts from article are posted.
Published Nov 30, 2009

Products and Practice: Testing Made Easier with Wireless Sensors

Date: November 2009
Source: Concrete International
Page 59.
Published Nov 02, 2009

PileBucks’ Interview with Dr. George Goble

Date: Vol. 25, Issue 3 2009
Source: PileBuck International, Inc.
Pages 10-14.
Published Oct 30, 2009

Sensores Inalámbricos Para Pruebas de Cimientos

Date: Octubre 2009
Source: Construccion Pan-Americana
Página 28.
Published Oct 15, 2009

Metodi di Prova e Analisi delle Fondazioni Profonde

Date: Settembre-Ottobre 2009
Source: Perforazioni & Fondazioni
Paginas 32-33.
Published Oct 02, 2009

Pile’s PDA Sensors Now Feature Wireless Transmission

Date: September/October 2009
Source: Southeast Asia Construction
Page 47.
Published Oct 02, 2009

Products: Testing Steel Piles

Date: November 2009
Source: Engineering News Record (ENR)
Page 34.
Published Sep 16, 2009

Wireless PDA Sensors

Date: Fall 2009
Source: Deep Foundations
Page 77.
Published Sep 15, 2009

High Strain Dynamic Pile Testing (HSDPT) Certification Explained

Date: Q3 2009
Source: Piledriver
Pages 82-83.
Published Sep 15, 2009

Deep Foundations for a Rail Bridge Replacement

Date: Fall 2009
Source: Deep Foundations
Pages 42-44.  DFI is an international technical association of firms and individuals involved in the deep foundations and related industry. Deep [...]
Published Sep 15, 2009

Case Space: Alumni in the News

Date: Fall 2009
Source: Case Alumnus
Page 27.
Published Sep 14, 2009

Engineer Receives Prestigious GBE Award

Date: September 2009
Source: World Wide Drilling Resource
Page 15.
Published Sep 08, 2009

Full Line of Pile Driving Analyizer Sensors Now Available with Wireless Transmission

Date: September 2009
Source: Arab Construction World
Page 12.
Published Sep 07, 2009

Dynamic Pile Testing

Date: September 2009
Source: Rebuilding America's Infrastructure
Pages 21-23.
Published Sep 06, 2009

Just Drop an APPLE

Date: September 2009
Source: GRL and PDI Newsletter
Page 1.
Published Sep 01, 2009

Pile Dynamics launches full sensor line-up

Date: August 2009
Source: GeoDrilling International

Published Aug 21, 2009

New Product News: Pile Dynamics Introduces Latest Model of SPT Analyzer

Date: August 2009
Source: Foundation Drilling
Page 86
Published Aug 02, 2009

Full Line of Pile Driving Analyzer Sensors with Wireless Transmission

Date: Special Issue August 2009
Source: Bautechnik
Page A13.
Published Aug 02, 2009

Pile Dynamics Introduces New Model of SPT Analyzer

Date: July-August 2009
Source: Southeast Asia Construction
Page 45.
Published Jul 30, 2009

Pavement Systems and Highway Design

Date: July 2009
Source: CE News
Pages 36-37.
Published Jul 03, 2009

Update on ThyssenKrupp CSA Atlantico steel mill

Date: July 2009
Source: Steel Guru
Correction note by PDI: On the 5th paragraph, where the article says “The test” it should say “The Pile Integrity Test”.
Published Jul 02, 2009

World Watch: Software Brings SPT Calibration Nearer

Date: Summer 2009
Source: European Foundations
Page 7.
Published Jun 30, 2009

Frank Rausche Received the 2009 G. Brooks Earnest Technical Lecture Award

Date: Summer 2009
Source: Deep Foundations
Page 36.
Published Jun 30, 2009

New Model of Pile Dynamics’ SPT Analyzer

Date: Summer 2009
Source: Deep Foundations
Page 77.
Published Jun 30, 2009

Quality Testing; Serious Consequences Averted at City Hall Development

Date: June 2009
Source: International Construction
Page 46.
Published Jun 22, 2009

Latest Model of Pile Dynamics’ SPT Analyzer Meets New Codes

Date: June 2009
Source: Piling Industry Canada Magazine
Page 14.
Published Jun 07, 2009

Frank Rausche, PhD, PE, President of Pile Dynamics, Inc. is Honoured

Date: June 2009
Source: Piling Industry Canada Magazine
Page 15.
Published Jun 07, 2009

Alta precisión en trabajos de cimentación

Date: Junio 2009
Source: Construccion Pan-Americana
Página 40.
Published Jun 05, 2009

Rausche Wins ASCE Award

Date: May/June 2009
Source: Southeast Asia Construction
Page 38.
Published May 31, 2009

Dr. Frank Rausche Wins G. Brooks Earnest Award

Date: May/June 2009
Source: Geo-Strata
Page 50.
Published May 31, 2009

Latest Model of Pile Dynamics’ SPT Analyzer Meets New Codes

Date: Spring 2009
Source: Drill Bits
Page 27.
Published May 30, 2009

Non Destructive Test Equipment

Date: May 2009
Source: Concrete International
Page 69.
Published May 20, 2009

Non Destructive Test Equipment

Date: May 2009
Source: Concrete International
Page 67.
Published May 20, 2009

Frank Rausche Presented the G. Brooks Earnest Award

Date: May 2009
Source: Foundation Drilling
Page 88.
Published May 20, 2009

Pile-Drive Analyzer: New Interface for Simpler Calibration

Date: May 2009
Source: Engineering News Record (ENR)
Page 33.
Published May 14, 2009

The Marquette Interchange, Milwaukee, WI

Date: May 2009
Source: GRL and PDI Newsletter
Page 1.
Published May 01, 2009

The Cleveland Section of ASCE Presents Dr. Frank Rausche, PE, with the Prestigious G. Brooks Earnest Award

Date: April 2009
Source: Arab Construction World
Page 22.
Published Apr 17, 2009

Quality Assurance for Continuous Flight Auger / Augered Cast-in-Place Piles

Date: April 2009
Source: Arab Construction World
Pages 20-21.
Published Apr 16, 2009

CHAMP by Pile Dynamics, Inc.

Date: April 2009
Source: Structural Engineer (Formally Structural Engineering And Design)
Page 37. Excerpts of article are posted.
Published Apr 15, 2009

The Acoustic Concrete Tester (ACT) from Inspection Instruments, Inc.

Date: April 2009
Source: Structural Engineer (Formally Structural Engineering And Design)
Page 37. Excerpts of article are posted.
Published Apr 15, 2009

Ensaio de Integridade em Estacas: Uma visão geral

Date: Abril de 2009
Source: Clube de Notícias
Página 9.
Published Apr 02, 2009

Ensuring Continuous Auger Quality

Date: April 2009
Source: GeoDrilling International
Page 35.
Published Apr 01, 2009

Pile Dynamics Receives Thanks for Educating Geotechnical Engineers

Date: March/April 2009
Source: Foundation Drilling
Page 62.
Published Mar 30, 2009

2009 G. Brooks Earnest Technical Lecture Award

Date: Vol. 25, No.2, 2009
Source: PileBuck International, Inc.
Page 27.
Published Feb 28, 2009

Pile Buck Interview; Clyde N. Baker, Jr.

Date: Vol. 25, No.2, 2009
Source: PileBuck International, Inc.
Page 17.
Published Feb 28, 2009

IFCEE09 Chairman’s Welcoming Comments

Date: Vol. 25, No.2, 2009
Source: PileBuck International, Inc.
Page 5.
Published Feb 28, 2009

Neue Entwicklungen für dynamische Pfahlprüfungen

Date: Februar 2009
Source: Messtechnik im Bauwesen
Seite 30-33.
Published Feb 28, 2009

Ethanol Plant

Date: January 2009
Source: Construction Europe
Page 35.
Published Jan 28, 2009

Assessing Drilled Shaft Quality Based on Cross Hole Sonic Logging Data

Date: January 2009
Source: Arab Construction World
Page 22.
Published Jan 20, 2009

CSL Comes to Australia

Date: January 2009
Source: National Building News
Page 21.
Published Jan 15, 2009

PDA Testing in a Wireless World

Date: January 2009
Source: National Building News
Page 23.
Published Jan 15, 2009

Pile Dynamics Introduces the CHAMP

Date: December/January 2009
Source: Foundation Drilling
Page 85.
Published Jan 02, 2009

Stresswave 2009: All you need to know about dynamic foundation testing

Date: January 2009
Source: GRL and PDI Newsletter
Page 1.
Published Jan 01, 2009

Devoted Concrete Tester

Date: December 2008
Source: World Tunnelling
Page 30.
Published Dec 27, 2008

Inspection Instruments, Inc.

Date: December 2008
Source: Structural Engineer (Formally Structural Engineering And Design)
Page 42.
Published Dec 15, 2008

Essais de Chargement Dynamique et ingenierie de battage de pieux

Date: December 2008
Source: BTP Magazine
Page 102.
Published Dec 01, 2008

Do Not Destroy; The Benefits of Non-Destructive Pile Testing

Date: Issue 2 2008
Source: Piling Canada
Pages 9-11.
Published Nov 01, 2008

Philadelphia Dock Story – Pile Challenges at Delaware River

Date: Fall 2008
Source: Deep Foundations
Page 51.
Published Oct 15, 2008

Digging Deep

Date: September 2008
Source: Construction Europe
Page 61. Excerpts of article are posted.
Published Sep 20, 2008

Advances in Dynamic Foundation Testing

Date: September 2008
Source: Arab Construction World
Page 19.
Published Sep 15, 2008

Stressed-Out Concrete Piles; The Effect of Diesel Hammer Combustion Chamber Pressure on Tension Stresses in Concrete Piles

Date: Q3 2008
Source: Piledriver
Page 56.
Published Sep 15, 2008

Can PIT do it all?

Date: September 2008
Source: GRL and PDI Newsletter
Page 1.
Published Sep 01, 2008

Replacing the Main Street Bridge; Pile Driving Analyzers Used to Measure Stress

Date: July 2008
Source: Michigan Contractor & Builder
Page 6.
Published Jul 07, 2008

No Cables Necessary

Date: Summer 2008
Source: Deep Foundations
Page 86.
Published Jul 05, 2008

Why not Timber Piles?

Date: Q2 2008
Source: Piledriver
Page 59.
Published Jun 15, 2008

Look – No Cables!

Date: May 2008
Source: Geotechnical News
Page 8. Pile Dynamics Releases Wireless Sensors.
Published May 25, 2008

Look – No Cables!

Date: May 2008
Source: PileBuck International, Inc.
Page 8.
Published May 25, 2008

Washington Bypass

Date: May 2008
Source: PileBuck International, Inc.
Page 48.
Published May 25, 2008

Innovative Wireless Testing of Deep Foundations in North Carolina, USA

Date: May 2008
Source: PileBuck International, Inc.
Page 48.
Published May 25, 2008

Pile Dynamics Releases Wireless Sensors

Date: May 2008
Source: Foundation Drilling
Page 78.
Published May 25, 2008

Company Unveils new Wireless Dynamic Load Testing of Foundations

Date: May 2008
Source: International Construction
Page 54.
Published May 05, 2008

Advances in Dynamic Foundation Testing

Date: May 2008
Source: GRL and PDI Newsletter
Page 1.
Published May 01, 2008

Pile’s New Wireless Sensors

Date: March/April 2008
Source: Southeast Asia Construction
Page 65.
Published Apr 01, 2008

Foundation Load Testing

Date: March 2008
Source: Engineering News Record (ENR)
Page 69.
Published Mar 24, 2008

Aren’t Specs Terms Supposed to be Plain?

Date: Q1 2008
Source: Piledriver
Page 56.
Published Mar 01, 2008

FHWA Releases GEC 8 – Design and Construction of CFA Piles

Date: January 2008
Source: GRL and PDI Newsletter
Page 1.
Published Jan 30, 2008

PDA Offers Two Convenient Modes

Date: January 2008
Source: Concrete International
Page 63.
Published Jan 21, 2008

Pile Dynamics, Inc

Date: December 2007
Source: Structural Engineer (Formally Structural Engineering And Design)
Page 43.
Published Dec 30, 2007

Conexpo Asia 2007 Show Preview

Date: November 2007
Source: International Construction
Pages 62-63. Excerpts from article are posted.
Published Nov 01, 2007

Pile Dynamics Celebrates 35 Years

Date: Fall 2007
Source: Deep Foundations
Page 67.
Published Oct 01, 2007

Pile Dynamics Celebrates 35 Years of Success

Date: Sept/Oct 2007
Source: Southeast Asia Construction
Page 46.
Published Sep 29, 2007

Pile Dynamics Celebrates 35 Years

Date: September 2007
Source: Geotechnical News
Page 48.
Published Sep 02, 2007

35th Anniversary

Date: September 2007
Source: Construction Europe
Page 54.
Published Sep 01, 2007

Criteria for Evaluating CSL Data

Date: September 2007
Source: GRL and PDI Newsletter
Page 1.
Published Sep 01, 2007

Pile Dynamics Celebrates 35 Years

Date: August 2007
Source: Florida Transportation Monthly
Page 28.
Published Aug 15, 2007

Dynamic Load Testing of Deep Foundations via Broadband

Date: Volume 6 Issue 6 2007
Source: Builders Exchange Magazine
Page 68.
Published Aug 07, 2007

Pile Driving Analyzer

Date: August 2007
Source: Better Roads
Page 66.
Published Aug 03, 2007

Pile Dynamics Celebrates 35 Years

Date: August 2007
Source: Arab Construction World
Page 27.
Published Aug 02, 2007

Pile Driveability and Bearing Capacity in High-Rebound Soils

Date: August 2007
Source: Arab Construction World
Page 24.
Published Aug 02, 2007

Dynamic load testing of deep foundations via broadband

Date: Jul-Aug 2007
Source: Southeast Asia Construction
Page 71.
Published Jul 28, 2007

Office Pile Analyser

Date: Summer 2007
Source: European Foundations
Page 5.
Published Jul 05, 2007

Dynamic Load Testing of Deep Foundations Enhanced by Latest Version of CAPWAP Software

Date: Summer 2007
Source: Deep Foundations
Page 63.
Published Jul 05, 2007

Pile Dynamics Celebrates 35 Years

Date: July 2007
Source: ASCE Orange County Branch Newsletter
Page 4.
Published Jul 02, 2007

Remote Pile Driving Monitoring

Date: July 2007
Source: CE News
Page 44.
Published Jul 02, 2007

Dynamic Load Testing of Deep Foundations Enhanced by Latest Version of CAPWAP Software

Date: June 2007
Source: Geotechnical News
page 56.
Published Jun 03, 2007

Pile Dynamics Celebrates 35 Years

Date: Vol. 23, Issue 6, 2007
Source: PileBuck International, Inc.
Page 15a.
Published Jun 02, 2007

Prueba de carga dinámica de cimientos profundos por banda ancha

Date: Junio 2007
Source: Construccion Pan-Americana
Página 38.
Published Jun 01, 2007

Foundation Data Transmission

Date: May/June 2007
Source: On-Site Magazine
Page 80.
Published May 30, 2007

CAPWAP enhances dynamic load tsting of deep foundations

Date: March/April 2007
Source: Southeast Asia Construction
Page 57.
Published May 25, 2007

Pile Dynamics Announces PDA Model PAX

Date: May 2007
Source: Foundation Drilling
Page 63.
Published May 25, 2007

Dynamic Load Testing of Deep Foundations via Broadband

Date: May 2007
Source: Arab Construction World
Page 56.
Published May 03, 2007

Pile Driving Analyzer goes Remote, so you don’t have to

Date: May '07 2007
Source: Builders Exchange Magazine
Page 66.
Published May 02, 2007

Deep Techniques

Date: May 2007
Source: International Construction
Page 47. Excerpts from article are posted.
Published May 02, 2007

Dynamic Load Testing of Deep Foundations Enhanced by Latest version of CAPWAP Software

Date: May 2007
Source: PileBuck International, Inc.
Page 14a.
Published May 02, 2007

Dynamic load testing of deep foundations via broadband: PDA model PAX

Date: May 2007
Source: PileBuck International, Inc.
Page 14a.
Published May 02, 2007

Capacity Confusions in 2007

Date: April 2007
Source: GRL and PDI Newsletter
Page 1.
Published May 01, 2007

Piling on the Wharf Front

Date: Spring 2007
Source: European Foundations
Page 12.
Published Apr 05, 2007

Dynamic Load Testing of Deep Foundations Enhanced by Latest Version of CAPWAP Software

Date: April 2007
Source: Florida Transportation Monthly
Page 28.
Published Apr 03, 2007

Latest Version of CAPWAP Software Available

Date: March/April 2007
Source: Foundation Drilling
Page 84.
Published Mar 30, 2007

Latest Version of CAPWAP Software

Date: March 2007
Source: Arab Construction World
Page 18.
Published Mar 02, 2007

The Advantages of Driven Piles

Date: Q1 2007
Source: Piledriver
Page 44.
Published Mar 01, 2007

Escambia Bay Bridge Foundation Testing Program

Date: February 2007
Source: Arab Construction World
Page 17.
Published Feb 02, 2007

Pile Dynamics, Inc.

Date: February 2007
Source: Concrete International
Page 61.
Published Jan 01, 2007

Standard Penetration Test Energy Measurements

Date: December 2006
Source: Structure Magazine

Published Dec 05, 2006

Pile Testing with PDA

Date: Nov/Dec 2006
Source: Southeast Asia Construction
Page 72.
Published Nov 29, 2006

Top 10 Bridges

Date: November 2006
Source: Roads & Bridges
Page 32. GRL Engineers performed dynamic load testing on this bridge.
Published Nov 02, 2006

Spotlight on EXPO ’07 Exibitors

Date: November 2006
Source: Foundation Drilling
Page 8.
Published Nov 01, 2006

Continuous Flight – a tour of job sites

Date: November 2006
Source: GRL and PDI Newsletter
Page 1.
Published Nov 01, 2006

Use of PDA testing on driven H-Piles

Date: Fall 2006
Source: Deep Foundations
Page 79.
Published Oct 01, 2006

Case Alumnus Travels the Earth to Study Beneath It

Date: Fall 2006
Source: Case Engineering Magazine
Page 4. The article originally ran in the Fall 2006 issue of Case Engineering magazine.
Published Oct 01, 2006

EPC to Show Pile Dynamics Products

Date: Sept/Oct '06 2006
Source: Southeast Asia Construction
Page 148.
Published Sep 29, 2006

Foundations

Date: September 2006
Source: Construction Europe
Page 56.
Published Sep 01, 2006

Light, rugged ACT

Date: August 2006
Source: Concrete Technology Today
Page 23.
Published Aug 02, 2006

Dynamic Duo

Date: August 2006
Source: Inside Business

Published Aug 01, 2006

Acoustic Concrete Tester

Date: Jul-Aug 2006
Source: Southeast Asia Construction
Page 57.
Published Jul 29, 2006

Amsterdam Conference Abstracts

Date: Summer 2006
Source: European Foundations
Page 24. Excerpts from article are posted.
Published Jul 05, 2006

Amsterdam Conference Exhibitors List

Date: Summer 2006
Source: European Foundations
Page 29. Excerpts from article are posted.
Published Jul 05, 2006

Seminario en Brasil de Pile Dynamics

Date: Julio 2006
Source: Construccion Pan-Americana
Página 19.
Published Jul 01, 2006

PDCA 2005 Project of the Year: Over $1 Million

Date: Q2 2006
Source: Piledriver
Pages 11-13.
Published Jun 15, 2006

Press Release: GRL Celebrates 30th Anniversary

Date: June 2006
Source: ASCE Orange County Branch Newsletter
Page 8.
Published Jun 01, 2006

GRL Celebrates 30th Anniversary in Foundations Work

Date: June 2006
Source: Florida Transportation Monthly
Page 28.
Published Jun 01, 2006

Solid Growth

Date: May 2006
Source: International Construction
Pages 42-43. Excerpts from article are posted.
Published May 01, 2006

Cross Hole Sonic Logging: Assuring quality under challenging circumstances

Date: April 2006
Source: GRL and PDI Newsletter
Page 1.
Published Apr 01, 2006

Gulf Offshore Oil Platforms on Safe Foundations

Date: February 2006
Source: Arab Construction World
Page 82.
Published Feb 20, 2006

Cost and Safety Factors Drive, Advance Basic Changes in Foundations

Date: January 2006
Source: Civil Engineering
Pages 72-78. Excerpts of article are posted.
Published Jan 31, 2006

Nuevo Software Simulador de Hincado de Pilotes de Pile Dynamics

Date: Enero 2006
Source: Construccion Pan-Americana
Página 43.
Published Jan 15, 2006

New Products

Date: January 2006
Source: Associated Construction Publications

Published Jan 01, 2006

Numbers Make a Difference: Correcting SPT Data

Date: Winter 2005
Source: Drill Bits
Page 14.
Published Dec 29, 2005

Dynamic APPLE Load Testing Over Water

Date: December 2005
Source: GRL and PDI Newsletter
Page 1.
Published Dec 01, 2005

Strongest DELMAG diesel pile hammer in Caspian Sea

Date: December 2005
Source: ABI Group News
Page 5.
Published Dec 01, 2005

Capital City at the Moscow International Business Center

Date: November 2005
Source: Arab Construction World
Page 78.
Published Nov 20, 2005

Pile load testing

Date: October 2005
Source: Construction Europe
Page 27.
Published Oct 06, 2005

Cross hole analyzer

Date: October 2005
Source: Better Roads
Page 65.
Published Oct 06, 2005

Driven Pile Committee

Date: Fall 2005
Source: Deep Foundations
Page 31. Excerpts of article are posted.
Published Oct 02, 2005

Cross Hole Sonic Logging Development

Date: Fall 2005
Source: Deep Foundations
Page 65.
Published Oct 02, 2005

HIH400 Hydraulic Hammer on Jacksonville Project

Date: Fall 2005
Source: Deep Foundations
Page 63.
Published Oct 02, 2005

Dynamic tests open timber pile potential

Date: Autumn 2005
Source: European Foundations
Page 7.
Published Oct 01, 2005

Latest Development in Crosshole Sonic Logging Reaches the Construction Market

Date: September-October 2005
Source: Arab Construction World
Page 75.
Published Sep 29, 2005

Pile Dynamics Develops Cross Hole Analyzer

Date: September/October 2005
Source: Foundation Drilling
Page 65.
Published Sep 29, 2005

Testing Self-Consolidating Concrete

Date: September/October 2005
Source: Foundation Drilling
Page 32.
Published Sep 29, 2005

Large Diameter Cast-in-Place Concrete Piles

Date: Q3 2005
Source: Piledriver
Page 40.
Published Sep 15, 2005

New Cross Hole Analyzer for construction market

Date: July/August 2005
Source: Southeast Asia Construction
Page 67.
Published Jul 29, 2005

Course: Driven Pile Foundations – Construction Monitoring

Date: Summer '05 2005
Source: Deep Foundations
Page 19.
Published Jul 05, 2005

8th Annual ACIP Pile Seminar

Date: Summer '05 2005
Source: Deep Foundations
Page 21.
Published Jul 05, 2005

2005 Professors Institute Best One Yet!

Date: Q2 2005
Source: Piledriver
Pages 4 – 6.
Published Jun 15, 2005

Testing Self-Consolidating Concrete

Date: June 2005
Source: GRL and PDI Newsletter
Page 1.
Published Jun 01, 2005

Woodrow Wilson Bridge

Date: May '05 2005
Source: International Construction
Page 30.
Published May 16, 2005

Pile Dynamics develops software for Pile Integrity Testing simulation

Date: Spring '05 2005
Source: Deep Foundations
Page 51.
Published Apr 05, 2005

Taking the strain

Date: March '05 2005
Source: Construction Europe
Page 47.
Published Mar 01, 2005

Construction Excellence Goes Hand-in-Hand with Assuring Foundation Quality

Date: March '05 2005
Source: Arab Construction World
Page 20.
Published Mar 01, 2005

Mejora el Cross Hole Analyzer de Pile Dynamics, Inc.

Date: Marzo '05 2005
Source: Construccion Pan-Americana
Página 48.
Published Mar 01, 2005

Estacas a toda prova

Date: Fevereiro de '05, Edição 95, ano 13 2005
Source: Téchne, Editora PINI
Página 34.
Published Feb 15, 2005

Missão do BNDES visita obra

Date: 13 de Fevereiro, 2005
Source: Diário de Natal
O Analizador de Cross Hole CHA foi empregado nos testes descritos neste artigo.
Published Feb 13, 2005

Software de Pile Dynamics para simulación de pruebas de integridad

Date: Febrero '05 2005
Source: Construccion Pan-Americana
Página 72.
Published Feb 04, 2005

Pile Dynamics Develops New Software for Pile Integrity Testing

Date: February '05 2005
Source: Foundation Drilling
Page 58.
Published Feb 04, 2005

Geräte und Software für dynamische Pfahlprüfungen

Date: Februar '05 2005
Source: Bautechnik
Seite A16.
Published Feb 01, 2005

Tiefgründung für die Lackierhalle des Airbus A 380

Date: Februar '05 2005
Source: Bautechnik
Seite A13.
Published Feb 01, 2005

New Software for Pile Integrity simulation

Date: Jan/Feb '05 2005
Source: Southeast Asia Construction
Page 48.
Published Jan 29, 2005

Dr. George Goble honored at GeoTrans Conference

Date: Winter '04/'05 2005
Source: Piledriver
Page 2.
Published Jan 29, 2005

7th Stresswave Conference Roundup

Date: Winter '05 2005
Source: Deep Foundations
Page 69.
Published Jan 29, 2005

Cost-Effective High Capacity Piles through Soil Set-up

Date: January 2005
Source: GRL and PDI Newsletter
Page 1.
Published Jan 01, 2005

Dr. Frank Rausche wins Distinguished Service Award from DFI

Date: December/January '04 2004
Source: Foundation Drilling
Page 66.
Published Dec 29, 2004

Conference Report – Dynamic Exchange

Date: November '04 2004
Source: Ground Engineering
Page 40.
Published Nov 01, 2004

Analyzer Upgrades Enhance Testing

Date: October '04 2004
Source: Concrete International
Page 114.
Published Oct 06, 2004

New Road Products; Smart gages for foundation testing

Date: October '04 2004
Source: Better Roads
Page 68.
Published Oct 06, 2004

Students Nominated for the Outstanding Engineering Student of the year Award

Date: Fall 2004
Source: Cleveland State University Fenn Focus
Page 9. Excerpts from article are posted.
Published Oct 01, 2004

Dr. George Goble Recalls 40 Years of Changes in the Pile-driving Industry

Date: Fall '04 2004
Source: Piledriver
Pages 32-33.
Published Oct 01, 2004

30 Road Crossing of the Union Pacific Railroad in Mesa County Colorado

Date: Sep/Oct '04 2004
Source: Arab Construction World
Page 76.
Published Sep 29, 2004

7th Stresswave Conference Roundup

Date: September 2004
Source: GRL and PDI Newsletter
Page 1.
Published Sep 01, 2004

Digging Deep

Date: September '04 2004
Source: International Construction
Page 34. Excerpts from article are posted.
Published Sep 01, 2004

Foundation Testing Just Got a Lot Smarter

Date: September '04 2004
Source: Geotechnical News
Page 57.
Published Sep 01, 2004

Pruebas de fundaciones más inteligentes de Pile Dynamics

Date: Septiembre '04 2004
Source: Construccion Pan-Americana
Página 39.
Published Sep 01, 2004

Capacity Testing for Deep Foundations

Date: August '04 2004
Source: Structure Magazine
Page 14.
Published Aug 01, 2004

Foundation Testing Just Got a Lot Smarter

Date: August '04 2004
Source: Foundation Drilling
Page 60.
Published Aug 01, 2004

No more calibration sheets on site

Date: August '04 2004
Source: Ground Engineering
Page 5.
Published Aug 01, 2004

Smart Gages

Date: July/August '04 2004
Source: Southeast Asia Construction
Page 58.
Published Jul 29, 2004

Foundation Testing Just Got a Lot Smarter

Date: July/August '04 2004
Source: Arab Construction World
Page 73.
Published Jul 29, 2004

The Plain Dealer – Made Here, Pile Driving Analyzer

Date: July 18, 2004
Source: The Plain Dealer

Published Jul 18, 2004

Foundation Monitoring and Testing in Full Color

Date: Summer '04 2004
Source: Deep Foundations
Page 51.
Published Jul 05, 2004

Geoengineer.org Website

Date: July '04 2004
Source: Geo News Center. Geoengineer.org
Excerpts from article are posted.
Published Jul 04, 2004

Pile installation recorder speeds construction and saves money

Date: June '04 2004
Source: Builders Exchange Magazine
Page 51.
Published Jun 01, 2004

Penetration Testing Today

Date: June 2004
Source: GRL and PDI Newsletter
Page 1.
Published Jun 01, 2004

Foundation Monitoring and Testing in Full Color

Date: June '04 2004
Source: Geotechnical News
Page 56.
Published Jun 01, 2004

Advanced Pile Testing

Date: May/June '04 2004
Source: Southeast Asia Construction
Page 34.
Published May 29, 2004

Better Bridges – Equipment Helps Solve Bridge Foundation Problems

Date: May '04 2004
Source: Better Roads
Page 60. Excerpts from article are posted.
Published May 01, 2004

Foundation Monitoring and Testing in Full Color

Date: May '04 2004
Source: Foundation Drilling
Page 34.
Published May 01, 2004

HCN On-Site E-newsletter – Monitoring Piles

Date: April 26th, 2004
Source: On-Site Magazine

Published Apr 26, 2004

PDCA Short Courses a Big Hit!

Date: Spring '04 2004
Source: Piledriver
Page 6.
Published Apr 05, 2004

PDCA Members AET and L.H. Bolduc Help Save Owner $1 Million in Wastewater Treatment Plant

Date: Spring '04 2004
Source: Piledriver
Page 10.
Published Apr 05, 2004

Pile Setup – A Competitive Edge

Date: Spring '04 2004
Source: Piledriver
Page 2.
Published Apr 05, 2004

Monitoring made easy

Date: April '04 2004
Source: Construction Europe
Page 52.
Published Apr 01, 2004

Monitoreo y pruebas de fundaciones a todo color

Date: Abril '04 2004
Source: Construccion Pan-Americana
Página 22.
Published Apr 01, 2004

Pile driving model upgraded

Date: April '04 2004
Source: Ground Engineering
Page 5.
Published Apr 01, 2004

Dynamic Testing of Micropiles by Pile Dynamics

Date: Mar/Apr '04 2004
Source: Arab Construction World
Page 17.
Published Mar 29, 2004

Deep Foundations Institute 2003 Distinguished Service Award

Date: March '04 2004
Source: Geotechnical News

Published Mar 01, 2004

Dynamic Testing of Micropiles

Date: February 2004
Source: GRL and PDI Newsletter
Page 1.
Published Feb 01, 2004

Dr. Frank Rausche presented with DFI Distinguished Service Award

Date: Winter '04 2004
Source: Deep Foundations
Page 21.
Published Jan 29, 2004

Inspecting Drilled Shafts Made Easy

Date: Winter '04 2004
Source: Deep Foundations
Page 41.
Published Jan 29, 2004

Pile Driving Analyzer Model PAK

Date: Jan/Feb '04 2004
Source: Arab Construction World
Page 13.
Published Jan 29, 2004

Pile Dynamics enhances its CHA

Date: Jan/Feb '04 2004
Source: Southeast Asia Construction
Page 37.
Published Jan 29, 2004

Dr. Frank Rausche wins DFI Distinguished Service Award

Date: Winter '04 2004
Source: Deep Foundations
Page 27.
Published Jan 29, 2004

Camilo Alvarez joins the new Los Angeles offices as Office Manager and Lead Engineer

Date: January '04 2004
Source: Concrete International
Page 101.
Published Jan 01, 2004

The Re-Engineered Pile Integrity Tester

Date: January '04 2004
Source: Better Roads

Published Jan 01, 2004

Dr. Frank Rausche wins DFI Award

Date: December '03 2003
Source: Ground Engineering
Page 5.
Published Dec 01, 2003

GRLWEAP Version 2003

Date: Nov/Dec '03 2003
Source: Arab Construction World
Page 85.
Published Nov 29, 2003

New Enhancements for the Cross Hole Analyzer

Date: November '03 2003
Source: Foundation Drilling
Page 84.
Published Nov 01, 2003

Installation Inspections: Why, What, When?

Date: October 2003
Source: GRL and PDI Newsletter
Page 1.
Published Oct 01, 2003

Distinguished Service Award 2003

Date: Fall '03 2003
Source: Deep Foundations
Page 13.
Published Oct 01, 2003

GRL-PDI Newsletter

Date: Fall '03 2003
Source: GRL and PDI Newsletter
Page 48.
Published Oct 01, 2003

Testing Equipment from EPC

Date: Sept/Oct '03 2003
Source: Southeast Asia Construction
Page 41.
Published Sep 29, 2003

Economical way of testing piles

Date: Sept/Oct '03 2003
Source: Southeast Asia Construction
Page 40.
Published Sep 29, 2003

Nuevo comprobador de integridad de pilotes de Pile Dynamics

Date: Augusto '03 2003
Source: Construccion Pan-Americana
Página 54.
Published Aug 12, 2003

Improved Integrity with new PIT model

Date: August '03 2003
Source: Ground Engineering
Page 5.
Published Aug 01, 2003

Test Shaft Installation for CSL

Date: Summer 2003
Source: GRL and PDI Newsletter
Page 1.
Published Jul 01, 2003

Constructibility of Augered Cast-In-Place Piles

Date: July '03 2003
Source: Geo-Strata
Pages 8-11. Constructability of Augered Cast-in-Place Piles, Tracy Brettmann, PE, Geo-Strata, Copyright 2003 ASCE, permission to publish granted [...]
Published Jul 01, 2003

Monitoring pile installation the easy way

Date: May/June '03 2003
Source: Southeast Asia Construction
Page 33.
Published May 29, 2003

San Mateo’s Impressive Bridge Project Finishes on Schedule

Date: Spring '03 2003
Source: Piledriver
Page 17.
Published Apr 05, 2003

Pile Dynamics

Date: Mar/Apr '03 2003
Source: Arab Construction World
Page 34.
Published Mar 29, 2003

Technological Review

Date: March '03 2003
Source: GeoDrilling International
Page 14. Excerpts from article are posted.
Published Mar 01, 2003

GRL-PDI Newsletter

Date: Winter '03 2003
Source: Deep Foundations
Page 57.
Published Jan 29, 2003

Just Run a Wave

Date: January 2003
Source: GRL and PDI Newsletter
Page 1.
Published Jan 01, 2003

PAL-R Wins Manufacturing Excellence Award

Date: Oct/Dec '02 2002
Source: Arab Construction World
Page 65.
Published Nov 05, 2002

Lateral Thinking in Tampa

Date: November '01 2001
Source: Ground Engineering
Page 14.
Published Nov 01, 2002

Stressed out in South Carolina

Date: November '02 2002
Source: Ground Engineering
Page 14.
Published Nov 01, 2002

Pile Dynamics, Inc. (PDI)

Date: Octubre '02 2002
Source: Construccion Pan-Americana
Página 91.
Published Oct 06, 2002

Crosshole Sonic Logging

Date: September 2002
Source: GRL and PDI Newsletter
Page 1.
Published Sep 01, 2002

Pile Dynamics and GRL Website Wins Award

Date: June/July '02 2002
Source: Arab Construction World
Page 29.
Published Jun 29, 2002

Berkel & Company Contractors Uses Latest Technology for Pile Monitoring and Testing and ASCE Deep Foundations Congress in Orlando, FL

Date: June 2002
Source: GRL and PDI Newsletter
Page 1.
Published Jun 01, 2002

Remote Possibilities

Date: May '02 2002
Source: Inside Business

Published May 01, 2002

Remote Pile Testing with Pile Driving Analyzers®

Date: January 2002
Source: GRL and PDI Newsletter
Page 1.
Published Jan 01, 2002

New Hammer Energy Measurements for the Popular Saximeter

Date: Dec/Jan '01 2001
Source: Arab Construction World
Page 16.
Published Dec 29, 2001

Pile foundation – Dynamic stress wave analysis for design and construction

Date: October '01 2001
Source: CE News

Published Oct 06, 2001

Dynamic Day in Osceola County

Date: Autumn '01 2001
Source: European Foundations
Page 8.
Published Oct 01, 2001

Nuevo equipo para control de calidad de Pile Dynamics

Date: Julio '01 2001
Source: Construccion Pan-Americana
Página 60.
Published Jul 01, 2001

Crosshole Sonic Logging for Assured Quality

Date: Jun/Jul '01 2001
Source: Arab Construction World
Page 8.
Published Jun 29, 2001

Times are Fast… and so is Pile Testing

Date: June 2001
Source: GRL and PDI Newsletter
Page 1.
Published Jun 01, 2001

U.S. Firm Designs New Dynamic Pile Test Device

Date: Spring '01 2001
Source: European Foundations
Page 5.
Published Apr 05, 2001

Florida digs deep for bridge project

Date: Winter '01 2001
Source: European Foundations
Page 7.
Published Jan 29, 2001

Newton’s Apple Falls in Amherst

Date: December 2000
Source: GRL and PDI Newsletter
Page 1.
Published Dec 01, 2000

High strain dynamic testing of driven and cast insitu piles – Dynamic testing of large piles

Date: September '00 2000
Source: Ground Engineering
Pages 34-35.
Published Sep 03, 2000

Driving equipment and recent developments, New technologies for quality assurance of piles

Date: September '00 2000
Source: Ground Engineering
Page 30.
Published Sep 02, 2000

PIR-A Receives Ohio New Product Award

Date: September '00 2000
Source: Arab Construction World
Page 16.
Published Sep 01, 2000

Performance of a lifetime

Date: September '00 2000
Source: Ground Engineering
Pages 22-23.
Published Sep 01, 2000

Fundaciones Profundas: tener fe a ciegas

Date: Septiembre '00 2000
Source: Construccion Pan-Americana
Página 26.
Published Sep 01, 2000

A Giant Step In San Francisco

Date: Summer '00 2000
Source: Piledriver
Page 7.
Published Jul 05, 2000

Deep Foundations: Believing Without Seeing

Date: June 2000
Source: GRL and PDI Newsletter
Page 1.
Published Jun 01, 2000

Apilando en eficiencia

Date: Junio '00 2000
Source: Latinoamérica Construcción
Pagina LC5. To view a translation of this article, visit http://www.pile.com/wp-content/uploads/2017/03/translation.pdf.
Published Jun 01, 2000

Firm Foundations

Date: March '00 2000
Source: Construction Europe
Page 38. Excerpts from article are posted.
Published Mar 01, 2000

“Class A” Capacity Predictions

Date: February 2000
Source: GRL and PDI Newsletter
Page 1.
Published Feb 01, 2000

One Post at a Time

Date: January '00 2000
Source: St. Croix Abis
Pages 1-2.
Published Jan 01, 2000

Nuevo analizador de hincado de pilotes de PDI

Date: Noviembre '99 1999
Source: Construccion Pan-Americana
Página 106.
Published Nov 01, 1999

Qué es capacidad de pilote?

Date: Noviembre '99 1999
Source: Construccion Pan-Americana
Página 100. To view a translation of this article as it appeared in our newsletter, visit http://www.pile.com/wp-content/uploads/2017/03/May1999.pdf.
Published Nov 01, 1999

Wave Equation Analysis – What it Can and Cannot Do

Date: August 1999 1999
Source: GRL and PDI Newsletter
Page 1.
Published Aug 01, 1999

What is Pile Capacity?

Date: May 1999 1999
Source: GRL and PDI Newsletter
Page 1.
Published May 01, 1999

New Measuring Device May Ramp Up Use of Pumped Piles

Date: January 18, '99 1999
Source: Engineering News Record (ENR)
Page 41.
Published Jan 18, 1999

The Pile Installation Recorder

Date: December 1998 1998
Source: GRL and PDI Newsletter
Page 1.
Published Dec 01, 1998

Driving Stresses in Piles

Date: April 1998 1998
Source: GRL and PDI Newsletter
Page 1.
Published Apr 01, 1998

GRL Tests Drilled Shafts

Date: November 1997 1997
Source: GRL and PDI Newsletter
Page 1.
Published Nov 01, 1997

High Strain Dynamic Testing of Drilled Shafts

Date: April 1997 1997
Source: GRL and PDI Newsletter
Page 1.
Published Apr 01, 1997

Testing Existing Pile Foundations

Date: December 1996 1996
Source: GRL and PDI Newsletter
Page 1.
Published Dec 01, 1996

SPT Improvements

Date: December 1995 1995
Source: GRL and PDI Newsletter
Page 1.
Published Dec 01, 1995

Routine Testing or a Professional Service?

Date: August 1995 1995
Source: GRL and PDI Newsletter
Page 1.
Published Aug 01, 1995

Hydraulic Hammers and GRLWEAP

Date: April 1995 1995
Source: GRL and PDI Newsletter
Page 1.
Published Apr 01, 1995

60-Ton hammer is a smash test

Date: December 7th, 2004
Source: St. Petersburg Times
Page 1B. GRL performed the dynamic load tests described in this front-page news article.
Published Dec 07, 0204