|
|
|
|
|
 |
|
| In the News |
 |
|
|
|
| Pile Installation Recorder, PIR | | • | New Augered Cast-in-Place Pile Inspector's Guide. GRL and PDI Newsletter, May 2010, Page 2 | | Originally published by GRL and PDI Newsletter | | • | Quality Assurance for Continuous Flight Auger / Augered Cast-in-Place Piles. Arab Construction World, April 2009, Pages 20-21 | | Posted with permission from Arab Construction World | | • | Ensuring Continuous Auger Quality. GeoDrilling International, April 2009, Page 35 | | Originally published by GeoDrilling International | | • | Pile Installation Recorder - New Name, Same Quality. GRL and PDI Newsletter, May 2008, Page 2 | | Originally published by GRL and PDI Newsletter | | • | FHWA Releases GEC 8 - Design and Construction of CFA Piles. GRL and PDI Newsletter, January 2008, Page 1 | | Originally published by GRL and PDI Newsletter | | • | Pile Dynamics, Inc. Structural Engineer, December 2007, Page 43 | | Originally published by Structural Engineer | | • | Continuous Flight - a tour of job sites. GRL and PDI Newsletter, November 2006, Page 1 | | Originally published by GRL and PDI Newsletter | | • | Seminario en Brasil de Pile Dynamics. Construccion Pan-Americana, Julio 2006, Página 19 | | Reproducido con permisión de Construccion Pan-Americana | | • | Pile installation recorder speeds construction and saves money. Builders Exchange Magazine, June '04, Page 51 | | Posted with permission from Builders Exchange Magazine | | • | Constructibility of Augered Cast-In-Place Piles. Geo-Strata, July '03, Pages 8-11 | | Constructability of Augered Cast-in-Place Piles, Tracy Brettmann, PE, Geo-Strata, Copyright 2003 ASCE, permission to publish granted by ASCE. | | Posted with permission from Geo-Strata | | • | Berkel & Company Contractors Uses Latest Technology for Pile Monitoring and Testing and ASCE Deep Foundations Congress in Orlando, FL. GRL and PDI Newsletter, June 2002, Page 1 | | Originally published by GRL and PDI Newsletter | | • | PIR-A Receives Ohio New Product Award. Arab Construction World, September '00, Page 16 | | Posted with permission from Arab Construction World | | • | New Measuring Device May Ramp Up Use of Pumped Piles. Engineering News Record (ENR), January 18, '99, Page 41 | | Originally published by Engineering News Record (ENR) | | • | The Pile Installation Recorder. GRL and PDI Newsletter, December 1998, Page 1 | | Originally published by GRL and PDI Newsletter | | [Back to top] | |
|
|
|